1886917 |
CONSULTANCY FOR THE FORMULATION OF MASTER PLANS AND CONDUCT OF FEASIBILITY STUDY OF BANAGO PORT INCLUDING SILTATION ASSESSMENT AND STRUCTURAL STABILITY/ANALYSIS OF THE EXISTING STRUCTURE, PORT OF BANAGO, BACOLOD CITY
|
|
|
|
|
|
|
|
|
|
REPAIR/REPLACEMENT OF RUBBER DOCK FENDER, PORT OF PULUPANDAN, PULUPANDAN, NEGROS OCCIDENTAL
|
|
|
|
|
|
|
|
|
|
REPAIR OF FLOORING AND FENDERING SYSTEM ALONG FAST CRAFT BERTHING AREA AT THE BACK OF PTB, PORT OF SAN CARLOS, SAN CARLOS CITY, NEGROS OCCIDENTAL
|
|
|
|
|
|
|
|
|
|
UNDERDECK AND UNDERWATER INVESTIGATION, PORT OF SAN CARLOS, SAN CARLOS CITY, NEGROS OCCIDENTAL (NRP-PUL-3-14)
|
|
|
|
|
|
|
|
|
|
MANPOWER SERVICES FOR PMO NEGROS OCCIDENTAL/BACOLOD/BANAGO/BREDCO
|
|
|
|
|
|
|
|
|
|
PROVISION OF TWENTY TWO (22) ADMINISTRATIVE & TECHNICAL SUPPORT PERSONNEL THROUGH MANPOWER SERVICES FOR CY 2015
|
|
|
|
|
|
|
|
|
|
REPAIR OF CHB FENCE BETWEEN PPA PROPERTY AND PHILIPPINE BULK CORPORATION, PORT OF PULUPANDAN, PULUPANDAN, NEGROS OCCIDENTAL (NRP-PUL-03-15)
|
|
|
|
|
|
|
|
|
|
REPAIR OF RIPRAP AT THE NORTH AND SOUTH PORTION OF THE PORT, PORT OF SAN CARLOS, SAN CARLOS CITY, NEGROS OCCIDENTAL (NRP-NBB-02-15)
|
|
|
|
|
|
|
|
|
|
REPAIR/REPLACEMENT OF NO. 4 V-ELEMENT RUBBER DOCK FENDER AT THE NEW WHARF, PORT OF PULUPANDAN, PULUPANDAN, NEGROS OCCIDENTAL (NRPNBB-04-15
|
|
|
|
|
|
|
|
|
|
REPAIR/REPLACEMENT OF NO. 4 V-ELEMENT RUBBER DOCK FENDER AT THE NEW WHARF, PORT OF PULUPANDAN, PULUPANDAN, NEGROS OCCIDENTAL (NRPNBB-04-15)
|
|
|
|
|
|
|
|
|
|
REPAIR OF CHB FENCE BETWEEN PPA PROPERTY AND PHILIPPINE BULK CORPORATION, PORT OF PULUPANDAN, PULUPANDAN, NEGROS OCCIDENTAL (NRP-PUL-03-15)
|
|
|
|
|
|
|
|
|
|
REPAIR OF RIPRAP AT THE NORTH AND SOUTH PORTION OF THE PORT, PORT OF SAN CARLOS, SAN CARLOS CITY, NEGROS OCCIDENTAL (NRP-NBB-02-15)
|
|
|
|
|
|
|
|
|
|
Repair of RC Pier Structure Phase 2, Port of San Carlos
|
|
|
|
|
|
|
|
|
|
REPAIR OF RC PIER STRUCTURE (PHASE II), PORT OF SAN CARLOS, SAN CARLOS CITY, NEGROS OCCIDENTAL (NRP-NBB-01-15)
|
|
|
|
|
|
|
|
|
|
REPAIR OF RC PIER STRUCTURE (PHASE II), PORT OF SAN CARLOS, SAN CARLOS CITY, NEGROS OCCIDENTAL (NRP-NBB-01-15)
|
|
|
|
|
|
|
|
|
|
PROPOSED DREDGING OF SAN CARLOS PORT, PORT OF SAN CARLOS, SAN CARLOS CITY NEGROS OCCIDENTAL
|
|
|
|
|
|
|
|
|
|
REPAIR/REPLACEMENT OF NO.4 V-ELEMENT RUBBER DOCK FENDER AT THE NEW WHARF (ADDITIONAL), PORT OF PULUPANDAN, NEGROS OCCIDENTAL
|
|
|
|
|
|
|
|
|
|
PROPOSED DREDGING OF DANAO PORT, PORT OF DANAO, ESCALANTE CITY, NEGROS OCCIDENTAL
|
|
|
|
|
|
|
|
|
|
REPAIR OF RIPRAP, PORT OF HINOBAAN, NEGROS OCCIDENTAL
|
|
|
|
|
|
|
|
|
|
UNDERDECK AND UNDERWATER INVESTIGATION, PORT OF HINOBAAN AND HIMAMAYLAN, NEGROS OCCIDENTAL
|
|
|
|
|
|
|
|
|