Repair/Improvement of 16th st., South Harbor Port Area Manila
|
|
|
|
|
|
|
|
|
|
Construction of Two-Storey Passenger Terminal building at TMO-Pasig River, South Harbor, Port Area, Manila
|
|
|
|
|
|
|
|
|
|
Dredging of Berth Areas of El Codo Canal., North and Sotuh Bank of Pasig River, South Harbor, Manila.
|
|
|
|
|
|
|
|
|
|
Repair Of Warehosue and 5th Floor of Marsman Bldg., South Harbor, Port Area, Manila.
|
|
|
|
|
|
|
|
|
|
Repair of Roadway and Drainage System, At Tipsi Compound, Muelle De Tacoma St., South Harbor., Port Area, Manila.
|
|
|
|
|
|
|
|
|
|
Repair of Roadway and Drainage System Along 2nd St., South Harbor, Manila.
|
|
|
|
|
|
|
|
|
|
Various Repair Works At Ferry Landing Terminal, Building (Including 2-Jetties), Bahay Silungan and Former Pier 13 TOO Bldg. At South Harbor, Port Area, Manila
|
|
|
|
|
|
|
|
|
|
Repair / Rehabilitation of Roadway and Drainage System at 8th St., South Harbor, Manila.
|
|
|
|
|
|
|
|
|
|
Repair/Improvement of Drainage System Along AC Delgado and Railroad Sts., South Harbor, Manila.
|
|
|
|
|
|
|
|
|
|
Repair of Former NAtional Steel Corp. Warehouse at 22nd st., South Harbor, Manila.
|
|
|
|
|
|
|
|
|
|
Establishment of Metes and Bounds of Territorial/Jurisdiction Areas of PMO NCR-South
|
|
|
|
|
|
|
|
|
|
Repair/Renovation of Existing PPA-GAD Center Bldg. at Bonifacio Drive, South Harbor, Port Area, Manila.
|
|
|
|
|
|
|
|
|
|
Repair/Rehabilitation of Rodaway and Drainage System at 25th St., South Harbor, Manila.
|
|
|
|
|
|
|
|
|
|
Maintenance Dredging of Berth of Pier 3, South Harbor, Manila
|
|
|
|
|
|
|
|
|
|
Maintenance Dredging of Berths of Pier 5, South Harbor, Manila.
|
|
|
|
|
|
|
|
|
|
REPAIR OF ROAD PAVEMENT & REPAIR/DECLOGGING OF DRAINAGE SYSTEM AT DELGADO & REAILROAD STS., SHEPZ, PORT AREA MANILA
|
|
|
|
|
|
|
|
|
|
REPAIR OF ASPHALT PAVEMENT AT RAILROAD ST. AND ROAD TRIBUTARIES WITHIN THE SOUTH HARBOR EXPANDED PORT ZONE (SHEPZ), PORT AREA, MANILA
|
|
|
|
|
|
|
|
|
|
REPAIR OF STREETLIGHTING SYSTEM ALONG A.C. DELGADO RAILROAD, 13TH 20TH, AND 25TH STS., SOUTH HARBOR, PORT AREA, MANILA
|
|
|
|
|
|
|
|
|
|
REPAIR OF ROCK BULKHEAD & REPAIR REPAINTING OF FERRY LANDING TERMINAL AT SLIP 14, SOUTH HARBOR, PORT AREA, MANILA
|
|
|
|
|
|
|
|
|
|
REPAIR OF SIDEWALK & REPAIR/DECLOGGING OF DRAINAGE SYSTEM AT BONIFACIO DRIVE AND 2ND ST., SOUTH HARBOR, MANILA
|
|
|
|
|
|
|
|
|