TERMINAL MANAGEMENT OFFICE OF BROOKE'S POINT
§
CONTACT INFORMATION
Contact Person: Erwin S. Gatpandan
TMO -Head
Cell. no. 09192797335
Email Address:
ramsys21@yahoo.com
I.
FACT
SHEET
A.
General Information.
The port of Brooke’s Point lies in the southern part of mainland
Palawan. It is 192 km. away
from Puerto
Princesa, and is a 4-hour drive via land transport. It is located at Bgy.
Bulingay of the same municipality. The port was a beneficiary of the
Palawan Area Development Project loan package, providing it with a
reinforced concrete pier approach, concrete pier landing, breakwater,
warehouse, open storage and parking areas. Major commodities
handled at the port are consumer goods, construction materials, and products of agricultural
industries.
B.
Port Profile
Location:
Latitude 08°46’95”N
Longitude 117°49’07”E (eastern side of Brooke’s Point).
Sea Distance:
It is 83.84 nautical
miles from Puerto Princesa.
Port Area:
Total Port Area -
17,209.50 sq.m.
Comm’l Area
- 2,480.00 sq.m.
Opn’l Area -
14,729.50 sq.m.
Land Access:
The Port is area is one
(1) kilometer away from the poblacion, with two-lane
concreted road.
Traffic is slightly heavy
when there is unloading or loading operations at the pier.
Entrance Channel:
Entrance channel
starts three miles northeast from lighthouse to avoid coral reef.
Turning Basin:
Maneuverability room
area is 300 meters semi-circle then turn northeast towards entrance
channel. Good for shallow draft
vessels with minimum draft of 1.3 fathoms.
Physical
Environment:
The pier is exposed to
northeast and southwest monsoons. Sea condition in the area varies
accordingly to
prevailing wind. Tidal range is .75 meter between MHHW and MLLW.
Anchorage:
The anchorage is
located 700 meters from shore with sufficient depth of 9 to 10 meters
with
approximately 4
square miles going to the open sea.
Pilotage:
Not compulsory.
Navigational Aids:
Equipped with only one
rotating lighthouse at the northern tip of the bay entrance.
Breakwater:
Breakwater of 48m x
150m.
Storage Areas:
201 square meters
warehouse; and open storage of about 230 square meters. 450 square
meters warehouse and transit
shed; and open storage of about 1,625 square meters.
Telecommunications:
Smart, Globe and Sun
Cellular mobile phone companies have cell sites in the area.
Globe and RCPI provide
telephone, telegram and telefax services.
Internet cafés abound
also
in the area.
Safety and Security Features:
The Port Police
Division implements the ISPS Code. PPD ensures order and safety inside
the port through control of
vehicles, pedestrians, cargo and vessels. All the buildings have fire
extinguishers as required. Safety
Signs and signboards
are put/displayed in areas where necessary.
Port Authority:
Port District Office of
Southern Luzon
Port Management Office
of Puerto Princesa
Terminal
Management Office of Brooke’s Point
Bgy.
Buligay, Brooke’s Point, Palawan
II.
MAP:


Other Government
Agencies at the Port:
Philippine Coast
Guard – Brooke’s Point Station
III.
VESSEL SERVICES
Berthing
Areas:
The port has an RC
wharf of 12m x 60m, connected to pier approach of 6m x 190m.
Roll-On Roll-Off
Ramp:
One roro facility of 12
m x 15.15 m.
Bunkering:
Available at local
fuel stations.
Fresh Water Supply:
Watering services are
provided by the Brooke’s Point Rural Waterworks
and Sanitation
Association, Inc. and by Lorenzo Tan
Development Corp.
BACK TO TOP
IV.
PORT FACILITIES
Medical Facilities:
Dental and medical
clinics abound in the area as well as
Brooke’s Point District Hospital.
Other Available Port Facilities:
Parking area spans to about 1,180.75 square meters. BACK TO TOP
V.
CARGO HANDLING SERVICES
Arrastre/Stevedoring:
Prudential Customs
Brokerage Service, Inc. (PCBSI) provides the cargo
handling services at
the Port of Brooke’s
Point.
Warehousing:
Warehouse measures 201
square meters.
Trucking/Hauling Services:
Shippers provide
their own trucks.
Porterage:
Porterage service is also provided by the cargo handling
contractor –
Prudential Customs Brokerage Service, Inc. (PCBSI
VI.
SERVICES FOR PASSENGERS, SHIPPERS AND THE GENERAL PUBLIC
Passenger Terminal Building:
The PTB has an area
of 375 square meters.
Vehicle Parking Area:
Area designated for
parking is 1,180.75 square meters
Banking Services:
There are local banks
in the area (please see Directory of Services).
.
Other Passenger
Services:
There are several terminals in town
– for shuttle vans (going to Puerto Princesa, or to other
southern municipalities.
VII.
REGULAR LINERS CALLING AT THE PORT
Domestic Liners:
Small launches plying
the Cagayan de Tawi-Tawi route and Balabac call at the Port of
Brooke’s Point.
Brooke’s Point – Cagayan de Tawi-Tawi:
M/L
Sitti Radza
M/L
Sugar Dianne
M/L
Sitti Natalie
BACK TO TOP
VIII.
DIRECTORY
OF SERVICES
Banks:
Land Bank of the
Philippines
J.P. Rizal St.,
Poblacion, Brooke’s Point, Palawan
First Consolidated Bank
M. Rodriguez St.,
Poblacion, Brooke’s Point, Palawan
Rural Bank of Brooke’s
Point
M. Rodriguez St.,
Poblacion, Brooke’s Point, Palawan
The Palawan Bank, Inc.
Pioneer St., Poblacion,
Brooke’s Point, Palawan
Bunkering:
Available at local
fuel stations.
Cargo Handling Operator:
Mr. Ruben C. Cabiguen
Operations Manager,
Prudential Customs Brokerage Service, Inc.
Port Area, Buligay,
Brooke’s Point, Palawan
Pilotage:
Not compulsory.
Power Supply:
Supplied by National
Power Corporation
Bgy. Ipilan,
Brooke’s Point, Palawan
Telecommunication:
Smart Communications
J.P. Rizal St.,
Poblacion, Brooke’s Point, Palawan
Globe Telecom
James Brookes St.,
Poblacion, Brooke’s Point, Palawan
Trucking/Hauling:
Shippers provide
their own trucks.
Water Supply:
Brooke’s Point Rural
Waterworks and Sanitation Association, Inc. and Lorenzo Tan Development Corporation, both at
the Poblacion of Brooke’s Point, Palawan.
Ice Supply:
Lorenzo Tan
Development Corporation
Poblacion, Brooke’s
Point, Palawan
PRIVATE PORT/S IN PUERTO BROOKE'S POINT
1. RIO TUBA NICKEL MINING
CORP.
Location:
Rio Tuba, Bataraza,
Palawan
Main Function:
Export of nickel silicate ore and import of
spare parts and heavy equipment for RTN projects
Facilities/Area Available:
4
47m x 20m jetty pier
Operator of Facilities:
RTNMC.
BACK TO TOP
2.
T. TAN PAREDES PIER (FORMERLY TRIDENT MINING CORP./PANACAN ROCK JETTY)
Location:
Panacan, Narra, Palawan
Main Function:
Loading of metallurgical low-grade lumpy
chrome in bulk.
Facilities/Area Available:
4
9m causeway
Operator of Facilities:
Joe Tan Paredes
BACK TO TOP
3. AGRICULTURAL INVESTORS, INC.
Location:
Bugsuk Island, Balabac,
Palawan.
Main Function:
Loading of Copra
Facilities/Area Available:
4 Wharf
Operator of Facilities:
AII
BACK TO TOP
4.
ANSCORLAND MANAGEMENT & DEVELOPMENT CORPORATION
Location:
Berong, Quezon, Palawan
Main Function:
Export of nickel silicate ore
Facilities/Area Available:
Operator of Facilities:
Anscorland BACK TO TOP
5. RIO
TUBA NICKEL MINING CORPORATION (NAGOYA BEACH)
Location:
Rio Tuba, Bataraza,
Palawan
Main Function:
Loading/unloading activities relative to
operations of hydrometallurgical processing plant.
Facilities/Area Available:
4
One 9m x 380m causeway/unloading platform
4
One 2.7m x 900m trestle
4
One 250m dia. sulfuric acid pipeline
4
One 250m dia. methanol pipeline
4
One supernatant pipeline
Operator of Facilities:
RTNMC BACK TO TOP
6. PLATINUM GROUP METALS
CORPORATION
Location:
Narra Palawan
BACK TO TOP